1. REPAIR
Minor sheet
metal repairs are made and all loose or missing fasteners are resecured
or replaced.
2.
WASH
The roof is power washed with water at
3000
psi.
3. INSTALL
Sheet
metal
crickets are installed behind all rooftop
units.
4.
TREAT
All rust is treated with rust inhibitor. Areas of residual asphalt are primed.
5.
SEAL
Horizontal seams, or endlaps, are
sealed with a 6" width of flashing grade reinforced with
high quality fabric. All vertical seams are sealed with flashing grade.
6.
DETAIL
All detail areas including curbs,
ridges, pipe penetrations, rakes, and skylight perimeters are sealed
with flashing grade and high quality fabric.
7.
ENCAPSULATE
Fasteners are encapsulated.
8.
RESTORE
Fiberglass skylights are restored.
9. INSPECT
The
roof
receives its first mandatory inspection by a certified technician.
10. INSTALL
The
base
coat of the synthetic-rubber membrane, typically gray, is
applied to the entire roof
area.
11. APPLY
The
finish
coat of the synthetic-rubber membrane, typically white,
is installed over the base coat. The total membrane thickness
is 28 dry mils.
12. CERTIFY
The
second certified inspection is performed and the warranty is issued.